Flip: Bathroom Renovation

Project Description

The main bathroom in this investment property required a face lift. We demo’d the existing bathroom down to the studs and installed all new drywall, floors, fixtures and fresh paint to create an inviting space for any potential homeowner.

Attic Conversion

Project Description

Our client had an attic space that she wanted to have converted into livable square footage. This project required insulation, electrical, plumbing, drywall, flooring, framing, paint, etc

20171205_092254

Master Bathroom Renovation

Project Description

This master bathroom was finished with a double vanity, tile backs plash, walk-in shower and tile tub surround.

7057

Bathroom Renovation

Project Description

This shared bathroom renovation included the demolition of the previous bathroom, installation of new drywall, floors, tile, vanity, fixtures, and glass shower enclosure.

Foyer Paint

Project Description

This 2-story foyer and staircase needed to be refreshed. Nothing a fresh paint application cant fix!

Office Conversion

Project Description

Here a wall was removed to open up the space.  A partition was built to separate the office from the entry way and the entire area was painted for consistency.

7046